All templates

Last Planner Lookahead Template

2.5Kviews
205uses
29likes

Report

Last planner.

Lookahead dashboard template to use in the Last Planner. Last Planner digital panels are shared. In wide format (two post-its) and in narrow formats (one post-it).

The use of labels and post-its is recommended for greater detail of the tasks to be executed.

plann3.com.ar

bbadano@plann3.com.ar

Bruno

Architect @ PLANN3

I am an architect, and I dedicate myself to the planning and control of architectural projects. Applying the Lean Construction philosophy.


Categories

Similar templates