
All templates
Timeline Design ⏳
Brigitta Laszlo
UX Consultant @ Grundfos
Brigitta is a multi-disciplined designer building next-level user-centric experiences. She is currently establishing, maturing & managing the Web Design System @Grundfos. "I believe that design must solve a need, stimulate innovation, and materialise as an experience that feels effortless, gratifying, trustworthy, and human."
Categories
Similar templates
401likes
5.1Kuses

83likes
708uses

686likes
3.1Kuses

401likes
5.1Kuses

83likes
708uses

686likes
3.1Kuses
