About the Roles & Responsibilities Venn Diagram template

“I thought you were doing that.” If you’ve heard this on your team, this template is for you. The Roles & Responsibilities Venn Diagram helps a team see who owns what, where roles overlap and which tasks nobody owns.

Instead of building a 50-row RACI matrix from scratch, the team sorts a prepared pool of responsibility cards across three overlapping circles, one per role. In 75–90 minutes you get a shared picture of ownership, a list of disputed responsibilities and an owner for every orphaned task.

What this template helps you accomplish

  • Clarify roles and responsibilities between roles with blurry boundaries, such as Product Owner, Project or Delivery Manager, Scrum Master and Tech Lead

  • Surface hidden disagreements about ownership before they turn into escalations

  • Find orphaned tasks: release notes, access management, onboarding, documentation, client communication during incidents

  • Agree on one lead for every shared responsibility

  • Create a lightweight alternative to a full RACI chart

Who can use this template

Project managers, delivery managers, Scrum Masters, Agile coaches, product owners and team leads. It works best for 4–10 people across 2–3 roles: a new team, a new role, a reorganisation, or a team where responsibilities keep falling through the cracks. For four or more roles, a RACI matrix works better.

What’s on the board

  • Instructions frame: goal, preparation, run of show, facilitator tips and next steps

  • Empty template: a pool of 32 ready-to-use responsibility cards, blank cards for the team’s own additions, a three-circle Venn diagram and three side zones: Internal (no owner), External (not ours) and Not sure (come back later)

  • Filled-in example: a fictional product team (Product Owner, Delivery Manager, Tech Lead) after the debrief

How to use this template

  1. Prepare the pool. Adapt the 25–40 responsibility cards to your team. Make them specific and start each with a verb: “agrees deadline shifts with the client”, not “communication”. Shuffle them so the order doesn’t hint at the owner.

  2. Label the circles with your team’s roles. Only two roles? Delete the third circle.

  3. Sort silently (15 min). Everyone drags cards into a single circle, an overlap or a side zone. If you disagree with someone’s placement, don’t move their card: duplicate it and place your copy where you think it belongs. Each duplicate signals a disagreement.

  4. Add what’s missing. The team adds its own responsibilities on blue cards: max 2 per person and 10 per session.

  5. Walk the board together (25 min). Go zone by zone. The facilitator reads the cards out and the team says “ok” or “stop”. Spend the time on duplicates and stops, not on the obvious.

  6. Name a lead for every overlap. Add it to the card, for example “· lead: PO”.

  7. Clear the side zones. Internal cards get an owner today. External cards get a handover contact. Not sure cards get a decision or a follow-up date.

  8. Document the outcome. Move the agreements to Confluence or Notion as a table (responsibility, lead, who helps) and schedule a review in 1–2 sprints.

Tips and best practices

  • A card in an overlap without a lead is not an agreement. There is always exactly one lead.

  • If the centre fills up, your cards are too generic. Break them into concrete actions.

  • Discuss roles, not people. A neutral facilitator who doesn’t hold any of the roles works best.

  • Don’t aim for walls between roles: overlaps are normal, the goal is clarity.

  • Avoid having a manager who evaluates the team in the room. It kills honest sorting.

Credits

Based on the Roles Venn Diagram workshop described by Ant Murphy and Tünde Szirák. Adapted by Alena Rudneva, Kangoo Management School.